The purpose of this erratum is to correct several mistakes and to clarify the rationale for the analysis presented in Mueller (2010). These corrections and clarifications do not affect the quantitative results of the maximum‐magnitude (mmax) sensitivity analysis that was presented in the article.

...

In two places (first paragraph of the EPRI/SOG and USGSmmax Distributions for Two CEUS Sites section and last paragraph of the Summary and Discussion section) the author incorrectly states that the U. S. Nuclear Regulatory Commission (NRC) “required” updates to the mmax distributions in the application for a site....

First Page Preview

First page PDF preview
You do not currently have access to this article.