Abstract
Time-lapse multicomponent seismic monitoring of pressure depletion in tight-gas development can be used to increase recovery efficiency. Tight-gas plays require technology to enhance the economic viability of resource development. Our study at Rulison Field, Colorado, confirms that time-lapse, multicomponent seismic surveys can monitor tight-gas depletion and be used for well planning and completion design.
You do not have access to this content, please speak to your institutional administrator if you feel you should have access.