Summary

Vertical and near vertical joints can have an important effect on tunnelling operations in rock. This paper describes an inclined drilling programme to study jointing along nearly 5 km of tunnel within the Kielder Water Scheme. Drilling problems are discussed, logging methods are described and the results are given. It is concluded that inclined drilling can have an important role in tunnel site investigations.

First Page Preview

First page PDF preview
You do not currently have access to this article.