Abstract
Pre-excavated withdrawal channel (PWC) is an effective means to shorten the withdrawal time of fully mechanized working face and improve the efficiency, safety, and reliability during the withdrawal. However, the key to the success of the withdrawal method is the influence of mining on the stability of PWC, taking the III32upper1 working face of Zhuzhuang Coal Mine as the engineering background. By theoretical analysis and numerical simulation, the deformation of the PWC is analyzed and the mechanical model of the influence of the instability of the main roof fracture on the PWC is established. And the effect of the fracture and rotation of the main roof on the PWC is analyzed. The result shows that the instability of the coal pillar leads to the fracture and rotary deformation of the main roof as the width of the coal pillar gradually decreases, which further aggravates the deformation of the PWC and the degree of ground pressure behavior. Based on the influence of mining on the PWC, a control method is proposed. This method uses hydraulic fracturing technology to weaken the mining stress and prevent the fracture of the main roof above the PWC. The control effect of hydraulic fracturing on PWC is analyzed through the establishment of numerical calculation model. The result of engineering practice demonstrates that the mining stress is significantly reduced, and the deformation of surrounding rock in the PWC is effectively controlled after hydraulic fracturing.
1. Introduction
The safe and rapid withdrawal is an important part in the production and is also an important content in the terminal operation of working face [1]. There are many ways of withdrawal of working face. Among them, PWC is one of the most common ways to achieve rapid withdrawal of equipment [2, 3]. However, the stability of the PWC is the prerequisite for the safe and rapid withdrawal [4]. Since the PWC is affected by the front abutment pressure of the working face and the stability of the main roof, it is necessary to take technical measures in advance to ensure safe and rapid withdrawal [5, 6].
Many scholars have done a series of research on guaranteeing the stability of PWC. Wang et al. explored the stress evolution and cumulative damage mechanism of coal pillar during mining disturbance [7]. Lv established a mechanical model of unmined coal pillar and revealed the dynamic characteristics of coal pillar [8]. He et al. and He and Li studied the damage features and optimal spacing of double withdrawal channel [9, 10]. Gu et al. analyzed the impact factors of the stability of the PWC before different ground pressure adjustment and studied the stress distribution of coal pillar at the end mining stage [11, 12]. Liu et al. and Lv et al. investigated the stress and deformation characteristics of surrounding rock of PWC under different mining conditions [13, 14]. Wang et al. found that the last weighting and the fracture position of the main roof are the key affecting the stability of the PWC [15]. Li et al. elaborate on the reasons for the asymmetric disruption of the PWC [16]. Feng et al. examined the relationship between the width of the coal pillar and the stability of the PWC by numerical simulation [17].
In view of the severe deformation of the PWC in the end mining stage, Ma et al. and Guo and Hong put forward the idea of controlling the stability of PWC by blasting roof cutting [18, 19]. He et al. proposed a zoning control strategy with high pressure water jet and asymmetric high strength cable beam network and three hole anchor cable groups and roof grouting as the core [20]. Zhang et al. presented a fixed-length roof cutting technology with vertical hydraulic fracture [21]. Qin et al. and Wang et al. introduced sectional excavation technology and combined support technology of anchor and bolt [22, 23]. Kang et al. analyzed the loading mechanisms of predriven longwall recovery rooms subjected to large abutment pressures and designed a reasonable support plan [24]. Feng and Wu put forward the support method of anchor cable and grouting Marisan [25]. Yang and Zhu raised the stoping and pressure releasing technology of the terminal mining section based on controlling the fracture position of main roof [26].
It can be seen that the existing related research mainly protect the stability of the PWC by strengthening support or forced caving, which plays a positive role in rapid and safe withdrawal. But it still needs a great deal of work to weaken the mining stress to guarantee the stability of the PWC. Therefore, this paper investigates the deformation of the PWC under the influence of mining and stability of the main roof. Based on this, a hydraulic fracturing pressure releasing control method is proposed. By analyzing the control effect and time-space relationship of this method, it provides a theoretical basis for the hydraulic fracturing control of PWC.
2. Surrounding Rock Deformation of Pre-excavated Withdrawal Channel under Mining Influence
With the decrease of the distance between the working face and the PWC, the width of the coal pillar gradually decreases. When the influence range of advance abutment pressure is greater than the width of coal pillar, the mining will affect the stability of PWC. Therefore, the UDEC numerical calculation model is used to analyze the surrounding rock deformation of PWC.
2.1. Engineering Geological Condition
The study site was the III32upper1 working face in the Zhuzhuang Coal Mine located at Anhui Province, China. The buried depth of the working face is 220 m~250 m. It was approximately 670 m long and 172 m wide. The width and height of the PWC are 4.4 m and 2.4 m. Layout of working face and columnar diagram of strata are shown in Figure 1. The PWC is perpendicular to the headgate and tailgate and is arranged in the position of the terminal line, as shown in Figure 2.
2.2. Establishment of Numerical Model
Based on the geological conditions of III32upper1 working face in Zhuzhuang Coal Mine, the UDEC numerical simulation model is established, as shown in Figure 3. The length of the model is 200 m and the height is 41.3 m. The depth of the coal seam is about 240 m, and the PWC is excavated in advance in the model. The PWC is 4.4 m wide and 2.4 m high. The bottom boundary of the model is fixed in the vertical direction; the left and right boundaries limit the horizontal displacement. The vertical stress of 5.1 MPa is applied to the upper boundary to simulate the overburden load. The physical and mechanical parameters of coal and rock mass are shown in Table 1.
2.3. Analysis of Surrounding Rock Deformation of Pre-excavated Withdrawal Channel
The stress distribution of the surrounding rock of the PWC is shown in Figure 4. It can be seen from the figure that the stress disturbance range is small when the working face is far from the PWC, and the peak stress of the coal pillar on the right side of the PWC is 10.00 MPa. When the width of the coal pillar in the working face is 25 m, the stress of the coal pillar increases obviously, which indicates that the PWC has entered the influence range of the advanced abutment pressure of the working face, and the peak stress of the right coal pillar increases to 12.56 MPa. When the distance between the working face and the PWC is 15 m, the peak stress of the right coal pillar reaches the highest, and the peak value is 16.85 MPa. When the width of the coal pillar is 10 m, the coal pillar is destroyed and gradually loses its bearing capacity, and the peak stress gradually decreases. When the width is 5 m, the peak stress has been reduced to 5.67 MPa.
Figure 5 illustrates the deformation of surrounding rock of PWC. The result shows that the advance abutment pressure has little effect on the stability of the PWC when the working face is more than 25 m away from the PWC. At the moment, the deformation is small and the surrounding rock is relatively stable. With the advance of working face, the front abutment pressure of working face and side abutment pressure of roadway are superposed. The influence of mining on the stability of the PWC increases, and the convergence of the roof and floor and the two ribs increases significantly. The maximum deformation of the roof, floor, rib of coal pillar, and rib of solid coal of the PWC is 469.7 mm, 1074.1 mm, 753.4 mm, and 399.9 mm, respectively. When the working face is 5 m away from the PWC, the deformation speed of surrounding rock reaches the maximum because the unmined coal pillar loses its bearing capacity. The deformation speed is 145.3 mm/d, 311.2 mm/d, 179.9 mm/d, and 76.7 mm/d, respectively.
3. Influence of Stability of Main Roof Structure on Pre-excavated Withdrawal Channel
3.1. Dynamic Changes of Fracture Instability of Main Roof above Pre-excavated Withdrawal Channel
In the process of working face advancing, the main roof will experience periodic fracture and instability process. Considering the most dangerous situation, that is, the fracture line of the main roof is located above the PWC [27]. As shown in Figure 6, in this case, the main roof will undergo the following three changes from stability to instability.
When the coal pillar between the working face and the PWC is wide, the main roof is not broken due to the support of the coal pillar and the hydraulic powered support. At this time, the main roof is in a cantilever beam state, as shown in Figure 6(a).
As the working face gradually approaches the PWC, the main roof fractures above the PWC when the hanging length of rock block A reaches the fracture limit. Rock block A and rock block B undergo rotation and extrusion. At this time, due to the large free space between the main roof and the gangue in the gob, the rock block A has not touched the gangue, as shown in Figure 6(b).
With the continuous advancement of the working face, rock block A continues to rotate and rock block B continues to rotate reversely with rock block A. The rotation angle of rock block A gradually increases, and the contact area with rock block B gradually increases. When rock block A rotates to touch the gangue, the load of roof structure is mainly supported by gangue in gob, as shown in Figure 6(c).
From the dynamic changes of the fracture and instability of the main roof, it can be seen that the coal pillar is broken and unstable under the influence of mining due to the decrease of width of the coal pillar. The fracture and instability of the main roof is caused by the sudden disappearance of the effective support of the coal pillar to the main roof. At the same time, the fracture and rotation of the main roof will further aggravate the deformation of the PWC and the degree of ground pressure behavior.
3.2. Mechanical Analysis of Stability of Main Roof Structure above Pre-excavated Withdrawal Channel
According to the analysis of the fracture characteristics of the main roof, rock block A is the key to ensure the stability of the PWC. Therefore, the structural mechanic model of rock block A is established to analyze the condition for the rotary deformation and instability of rock block A, and the condition that the support resistance of the hydraulic powered support in the working face needs to meet when the rotary instability occurs.
In the mechanical model of Figure 7, is the length of rock block A, m; is the weight per unit length of rock block A and overlying strata, MN/m; is the horizontal thrust of rock block A, and is the rotation angle of rock block A, °; is the thickness of the main roof, m; is the length of the contact surface between rock blocks, m; is the supporting reaction force of gob, MN; is the support resistance of the working face hydraulic powered support, MN; is the support resistance of the chock hydraulic support, MN; and are the width of the PWC and the control distance of the working face support, m; the resultant force of acts at ; and the resultant force of acts at .
It can be seen from Equation (6) that the support resistance of the working face hydraulic powered support is proportional to the rotation angle of rock block A. With the decrease of the width of unmined pillars in the working face, the rotation angle of rock block A gradually increases, and the support resistance of the hydraulic support in the working face also increases. When rock block A undergoes rotary deformation and instability, the support resistance of the hydraulic powered support needs to meet the conditions in Equation (6).
3.3. Stability Analysis of Main Roof under Artificial Roof Cutting Condition
Based on the influence of the natural fracture and instability of the main roof, the PWC can be put under the stable cantilever rock beam by artificial roof cutting in advance, so as to avoid the influence of the natural fracture and rotary deformation of the main roof on the PWC and improve the stability of the surrounding rock of the roadway.
Through artificial roof cutting, the fracture line of the main roof is controlled behind the working face. At this time, the main roof above the PWC is a cantilever beam structure, and the mechanical model is established for analysis, as shown in Figure 8. Where is the load of overlying strata; is the thickness of the main roof; is the distance from the plastic zone of coal rib to the fracture position of the roof; and is the width of plastic zone of the coal rib.
The force of main roof includes the load of overlying strata , the support resistance of the chock hydraulic support, and the rating support resistance of the working face hydraulic powered support. The deflection deformation caused by each force is calculated separately, and the final deflection deformation of the main roof can be obtained by the sum of each deflection deformation.
4. Control Effect of Hydraulic Fracturing Pressure Relief on Pre-excavated Withdrawal Channel
4.1. Control Method Based on Pre-excavated Withdrawal Channel Stability
According to the above analysis, the surrounding rock deformation of the PWC located in the terminal line of the working face will be affected by the front abutment pressure and the rotary motion of the main roof. Directional fracturing is fundamental to weakening the hard roof in the mine [29, 30]. Therefore, the control method of weakening mining stress and artificial roof cutting by hydraulic fracturing is proposed, as shown in Figure 9.
- (1)
The fracture network is formed in the roof by hydraulic fracturing, which destroys its integrity, forms the weak structure of key rock strata, and weakens the mechanical properties of the roof, so as to change the stress transfer path and reduce the influence of the front abutment pressure on the PWC
- (2)
In order to avoid the influence of natural fracture and rotary deformation of the main roof, the main roof is cut off by hydraulic fracturing within the predetermined range above the PWC, so that the PWC is placed below the stable rock beam and the stability of the surrounding rock of the roadway is improved
4.2. Numerical Simulation Analysis on Control Effect of Hydraulic Fracturing on Pre-excavated Withdrawal Channel
4.2.1. Establishment of Numerical Calculation Model
The numerical calculation model was established by using UDEC to further study the control effect of hydraulic fracturing on the PWC. As shown in Figure 10, the area of hydraulic fracturing is determined by calculating the height of the caving zone and considering the influence range of the front abutment pressure. The target stratum of hydraulic fracturing is the main roof. Weakening the mechanical properties of rock mass by hydraulic fracturing is a process of cracking damage. Therefore, the degree of rock cracking can be expressed by the change of damage variable . According to the parameter calculation formula corresponding to different damage variables [31], the mechanical parameters of sandstone are divided into 6 grades, as shown in Table 2.
4.2.2. Analysis of Numerical Results
Figure 11 illustrates the final deformation of the PWC with different damage variables. With the increase of damage variable , the deformation of roof and floor and two ribs gradually decreases; when the damage variable is 0.3, the variation amplitude of roadway deformation is significantly reduced. At this time, the deformation of roof, floor, rib of solid coal, and rib of coal pillar are 274.3 mm, 783.8 mm, 301.9 mm, and 600.0 mm. Compared with the deformation without fracturing, the deformation decreased by 41.6%, 27.0%, 24.5%, and 20.3%, respectively.
Since the coal pillar has been destroyed when the width is 10 m, the influence of the degree of damage on the stress distribution in the surrounding rock of the roadway when the working face is 15 m away from the PWC is analyzed, as shown in Figure 12. With the increase of the damage variable, the peak stress of the coal pillar, the immediate roof, and the main roof gradually decrease. When the damage variable is 0.3, the variation amplitude of peak stress is significantly reduced. The peak stress of coal pillar decreases from 16.85 MPa to 13.14 MPa, with a decrease of 22.0%. The stress of immediate roof decreased from 14.86 MPa to 11.83 MPa, with a decrease of 20.4%, and the stress of main roof decreased from 10.32 MPa to 9.52 MPa, with a decrease of 7.8%.
The influence of the degree of fracturing on the difference of peak stress is shown in Figure 13. With the increase of damage variable , the difference of peak stress of coal pillar, immediate roof, and main roof increases gradually. This indicates that the greater the degree of rock-cracking damage, the better the weakening effect. When the damage variable is 0.3, the change of difference decreases obviously, and the difference of coal pillar, immediate roof, and main roof is 3.71 MPa, 3.03 MPa, and 0.80 MPa, respectively.
Figure 14 illustrates the effect of fracturing degree on the rotation angle of main roof. The result shows that the rotation angle of the main roof decreases with the increase of damage variable. When the damage variable is 0.3, the change of the rotation angle decreases significantly, and the final angle decreases from 2.83° to 1.95°, with a decrease of 31.1%.
Based on the above analysis results, it can be concluded that the stability of the PWC after hydraulic fracturing has been significantly improved. The higher the degree of fracturing, the better the effect of hydraulic fracturing; when the damage variable is 0.3, the effect is obviously reduced, so the value is determined to be a reasonable degree. It provides a basis for determining parameters of hydraulic fracturing.
5. Field Engineering Test
5.1. Determination of Time-Space Relation of Hydraulic Fracturing
The pressure relief control of hydraulic fracturing should be coordinated in time and space with the mining of working face. Therefore, hydraulic fracturing should be completed before the PWC is affected by mining. The field measurement results indicate that the influence range of mining is 28 m, and the daily advancing distance of the working face is 4.8 m. According to the field construction experience, it takes 14 days to drill holes and complete hydraulic fracturing. Therefore, the hydraulic fracturing should be completed 20 days before the working face is connected with the PWC.
According to the principle that the collapsed roof should be filled with gob after hydraulic fracturing, the fracturing height is determined to be 14 m. From the above theoretical analysis, the minimum fracture length of main roof is 16.6 m, and the reasonable position of roof cutting is 9.2 m away from the solid coal rib of the PWC.
5.2. Analysis of Effect
The field test was carried out on the PWC of III32upper1 working face in Zhuzhuang Coal Mine. In order to evaluate the effect of hydraulic fracturing, a stress observation station was set up in the middle of the PWC, and five horizontal boreholes were drilled in the station. The borehole lengths were 3 m, 5 m, 8 m, 10 m, and 12 m, respectively. And three roadway deformation observation stations were arranged in the PWC: observation section 1 was the upper station (40 m away from the tailgate), observation section 2 was the middle station (95 m away from the tailgate), and observation section 3 was the lower station (130 m away from the tailgate).
The monitoring curve of stress change of station A in the PWC after fracturing is shown in Figure 15. After hydraulic fracturing, the peak value of front abutment pressure is 13.38 MPa, the stress concentration coefficient is 2.39, and the influence range of front abutment pressure is about 22 m. It can be seen from the field measurement results that the peak value of the advanced abutment pressure of the working face is 16.85 MPa, and the influence range of the advanced abutment pressure is about 28 m without fracturing. After fracturing, the peak value of advanced abutment pressure decreased by 20.6%, and the influence range of advanced abutment pressure decreased by 27.3%.
The deformation of the PWC with the advance of the working face is shown in Figure 16. The field observation shows that the deformation of the roadway gradually increases with the advance of the working face. When the working face is about 24 m away from the PWC, the roadway enters the influence range of the advanced abutment pressure of the working face, and the deformation begins to increase significantly. The deformation of the middle station is the largest and the upper station is the smallest. The average deformations of roof, floor, rib of solid coal, and rib of coal pillar of three stations are 259.5 mm, 726.9 mm, 300.8 mm, and 550.3 mm. It can be observed that the locations where deformation occurs after hydraulic fracturing are mainly floor and rib of coal pillar, and the deformation of roof and rib of solid coal is small.
Due to the effective control of the PWC by roof cutting and pressure relief, the surrounding rock is generally stable, the roof does not appear obvious deformation, and the bolt and anchor do not appear fracture and failure, as shown in Figure 17. The withdrawal of the working face adopts the monorail crane withdrawal technology, so the good integrity of the roof is the key to ensure the success of the withdrawal work. The PWC meets the requirements of equipment withdrawal operation, shortens the withdrawal time of working face, ensures the safety of retracement, and achieves significant technical effects.
6. Conclusion
- (1)
Within the influence range of the advanced abutment pressure of the working face, the stress in the interval coal pillar increases significantly with the decrease of the distance from the working face to the PWC. When the width is 10 m, the coal pillar is destroyed. When the working face is 5 m away from the PWC, the deformation speed of the surrounding rock reaches the maximum
- (2)
The fracture line of the main roof above the PWC is the position where the main roof has the greatest influence on the stability. At this time, the supporting resistance of the hydraulic support increases with the increase of the rotation angle of the main roof, and the deformation of the surrounding rock of the PWC is intensified. The stability of the PWC is maintained by the artificial roof cutting method, and the minimum roof cutting length of the main roof is 16.6 m
- (3)
It is an effective control method to use hydraulic fracturing technology to release pressure and prevent the main roof fracturing above the PWC. Furthermore, the higher the degree of fracturing, the better the control effect. Finally, the reasonable degree is determined as the damage variable is 0.3
- (4)
The time-space relationship of hydraulic fracturing is determined according to the field conditions. Moreover, the measurement results indicate that the mining stress is obviously reduced and the deformation of the PWC is effectively controlled by the hydraulic fracturing
Data Availability
The data used to support the findings of this study are included within the article.
Conflicts of Interest
The authors declare that they have no conflicts of interest.
Acknowledgments
The work was supported by the National Natural Science Foundation of China (No. 52074267). The authors gratefully acknowledge the financial support of the agency mentioned above.