Abstract

A method of determination of the size of ore body associated with a mineralized intersection is presented which utilizes the primary voltage disturbance created by the body and the variation of the disturbance with electrode spacing. The form of the disturbance function is compared with theoretical curves based on the oblate spheroid.

This content is PDF only. Please click on the PDF icon to access.

First Page Preview

First page PDF preview
You do not currently have access to this article.