Skip to Main Content
Skip Nav Destination

The Geita mine is operated by AngloGold Ashanti and currently comprises four gold deposits mined as open pits and underground operations in the Geita greenstone belt, Tanzania. The mine produces ~0.5 Moz of gold a year and has produced ~8.3 Moz since 2000, with current resources estimated at ~6.5 Moz, using a lower cut-off of 0.5 g/t.

The geologic history of the Geita greenstone belt involved three tectonic stages: (I) early (2820–2700 Ma) extension (D1) and formation of the greenstone sequence in an oceanic plateau environment; (II) shortening of the greenstone sequence (2700–2660 Ma) involving ductile folding...

You do not have access to this content, please speak to your institutional administrator if you feel you should have access.
Close Modal

or Create an Account

Close Modal
Close Modal