Skip to Main Content

Abstract

Escalating costs, disputes and delays can arise during construction as a result of inadequate research at the early stages of project development. The assessment of slope stability hazard described in this case history illustrates the relative ease, and therefore low cost, of rapidly accessing and evaluating a wide range of desk study and walk over survey data pertinent to a construction project.

You do not currently have access to this chapter.

Figures & Tables

Contents

GeoRef

References

Related

Citing Books via

Close Modal
This Feature Is Available To Subscribers Only

Sign In or Create an Account

Close Modal
Close Modal